November 21, 2006 L-Store Planning Meeting (VU): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
== Attending == | |||
* Hagewood (Nevoa) | |||
* Brown, Dawson, de Ledesma, Sheldon, Tackett (VU) | |||
== Meeting Goal == | |||
Develop an initial strategy for development and releases of L-Store software. There was | |||
also some discussion of planned hardware deployment for the near term. | |||
=== L-Store Releases and Features === | |||
* <b>L-Store Release 0.8</b> December 4 REDDnet@I2 meeting | |||
* <b>L-Store Release 0.9</b> End of January 2007 | |||
* <b>L-Store Release 1.0</b> May/June 2007 | |||
=== Near-Term Hardware Deployment === | |||
* Validation, Verification, and Performance Testing Depot | |||
** We will deploy 20 of the Capricorn Depots in a single system that can be used for validation, verification, and performance testing. | |||
** This system will be for developers use only, and it can be taken down at any time. Software can be updated at any time. | |||
** Nightly, the L-Store development release code will be built, installed, and tested with Clyde. This may take a few months to get going smoothly. | |||
* User System | |||
** The remainder of the systems (20) will be deployed as a user facility. |
Revision as of 15:21, 29 November 2006
Attending
- Hagewood (Nevoa)
- Brown, Dawson, de Ledesma, Sheldon, Tackett (VU)
Meeting Goal
Develop an initial strategy for development and releases of L-Store software. There was also some discussion of planned hardware deployment for the near term.
L-Store Releases and Features
- L-Store Release 0.8 December 4 REDDnet@I2 meeting
- L-Store Release 0.9 End of January 2007
- L-Store Release 1.0 May/June 2007
Near-Term Hardware Deployment
- Validation, Verification, and Performance Testing Depot
- We will deploy 20 of the Capricorn Depots in a single system that can be used for validation, verification, and performance testing.
- This system will be for developers use only, and it can be taken down at any time. Software can be updated at any time.
- Nightly, the L-Store development release code will be built, installed, and tested with Clyde. This may take a few months to get going smoothly.
- User System
- The remainder of the systems (20) will be deployed as a user facility.