May 7, 2008: Difference between revisions

From ReddNet
Jump to navigation Jump to search
Line 19: Line 19:
* VTNA Status, meeting with Marshall and others (Santi)
* VTNA Status, meeting with Marshall and others (Santi)
* AmericaView (PR?)
* AmericaView (PR?)
* Supernova Progress (Blondin/Chris?)
* TSI Progress (Terry/Chris)
**An important question here is what the status of the ORNL depots is, since John B. will want to be able to upload to REDDnet from EWOK. If local REDDnet hardware is available, it's likely that the update will be much faster.
* CMS Progress (Engh)
* CMS Progress (Engh)
* Do we want to contribute to the [http://datagrid.ucsd.edu/toolkit/contribute.php OSG Operations Toolkit]?
* Do we want to contribute to the [http://datagrid.ucsd.edu/toolkit/contribute.php OSG Operations Toolkit]?

Revision as of 09:16, 7 May 2008

REDDnet Collaboration Meeting

Coordinates

  • May 7, 2008 -- 11:00ET/10:00CT/8:00PT
  • Call 510-665-5437
  • Meeting ID is 7333

Attending

  • Santi, Alan, Bobby (Vanderbilt ACCRE)
  • Paul, Dan (Vanderbilt Physics)
  • John (ORNL)
  • Micah, Terry, Harrold and Chris (UTK)
  • Hunter (Nevoa)
  • ???

Agenda

  • NFU proposal (Chris and Alan)
  • LOC Status (Santi)
  • VTNA Status, meeting with Marshall and others (Santi)
  • AmericaView (PR?)
  • TSI Progress (Terry/Chris)
    • An important question here is what the status of the ORNL depots is, since John B. will want to be able to upload to REDDnet from EWOK. If local REDDnet hardware is available, it's likely that the update will be much faster.
  • CMS Progress (Engh)
  • Do we want to contribute to the OSG Operations Toolkit?