Deployment: Current state, plans for next 6 months, issues raised.: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
* sites that are up except: | * sites that are up except: | ||
**umich - 4 sites up, 8 not. need to coordinate with local person, waiting now for that. they are having switching problems, dying hardware, ( | ** umich - 4 sites up, 8 not. need to coordinate with local person, waiting now for that. they are having switching problems, dying hardware, (mis-configured?). | ||
**need to request | ** need to request an IT contact | ||
**had to buy a new KVM - that turned out not to be the problem, but a | ** had to buy a new KVM - that turned out not to be the problem, but a mis-configured switch there. extra KVM is at Vandy, so we have a spare | ||
*need a technical contact/site user level agreement for what is required. | |||
*UFL and UMich are only places | * need a technical contact/site user level agreement for what is required. | ||
at | |||
* UFL and UMich are only places without an IT contact, and this may be what we have at these places. | |||
* deploying latest depot code on all depots as we speak. | |||
* Oak Ridge - not brought up yet. | |||
** productive meeting end of March | |||
** we will be put outside ORNL's perimeter | |||
** same area that TeraGrid hardware is | |||
** so we could be part of TeraGrid... |
Revision as of 08:05, 21 April 2008
- sites that are up except:
- umich - 4 sites up, 8 not. need to coordinate with local person, waiting now for that. they are having switching problems, dying hardware, (mis-configured?).
- need to request an IT contact
- had to buy a new KVM - that turned out not to be the problem, but a mis-configured switch there. extra KVM is at Vandy, so we have a spare
- need a technical contact/site user level agreement for what is required.
- UFL and UMich are only places without an IT contact, and this may be what we have at these places.
- deploying latest depot code on all depots as we speak.
- Oak Ridge - not brought up yet.
- productive meeting end of March
- we will be put outside ORNL's perimeter
- same area that TeraGrid hardware is
- so we could be part of TeraGrid...