* sites that are up except:
* sites that are up except:
**umich - 4 sites up, 8 not.  need to coordinate with local person, waiting now for that.  they are having switching problems, dying hardware, (misconfigured?).   
** umich - 4 sites up, 8 not.  need to coordinate with local person, waiting now for that.  they are having switching problems, dying hardware, (mis-configured?).   
**need to request a technical contact
** need to request an IT contact
**had to buy a new KVM - that turned out not to be the problem, but a misconfigured switch there.  extra KVM is at Vandy, so we have a spare
** had to buy a new KVM - that turned out not to be the problem, but a mis-configured switch there.  extra KVM is at Vandy, so we have a spare
*need a technical contact/site user level agreement for what is required.
 
*UFL and UMich are only places with a non-technical contact, and this may be what we have
* need a technical contact/site user level agreement for what is required.
at this places.
 
* UFL and UMich are only places without an IT contact, and this may be what we have at these places.
 
* deploying latest depot code on all depots as we speak.
 
* Oak Ridge - not brought up yet.
** productive meeting end of March
** we will be put outside ORNL's perimeter
** same area that TeraGrid hardware is
** so we could be part of TeraGrid...

Revision as of 08:05, 21 April 2008

  • sites that are up except:
    • umich - 4 sites up, 8 not. need to coordinate with local person, waiting now for that. they are having switching problems, dying hardware, (mis-configured?).
    • need to request an IT contact
    • had to buy a new KVM - that turned out not to be the problem, but a mis-configured switch there. extra KVM is at Vandy, so we have a spare
  • need a technical contact/site user level agreement for what is required.
  • UFL and UMich are only places without an IT contact, and this may be what we have at these places.
  • deploying latest depot code on all depots as we speak.
  • Oak Ridge - not brought up yet.
    • productive meeting end of March
    • we will be put outside ORNL's perimeter
    • same area that TeraGrid hardware is
    • so we could be part of TeraGrid...