August 15, 2008

From ReddNet
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

REDDnet Collaboration Meeting

Coordinates

  • August 15, 2008 -- 11:00ET/10:00CT/8:00PT
  • Call 510-665-5437
  • Meeting ID is 7333

Attending

  • Bobby, Matt, Paul and Santi (Vanderbilt ACCRE)
  • Diana and PR (SFASU)
  • Chris, Gerrald, Micah and Terry (UTK)
  • Dan (Vanderbilt Physics)

Agenda

  • Status reports
    • UTK depots (Gerrald)
      • short term interest in deploying IBP based SEs for OSG...
      • high capacity link to Fermilab will unfortunately not be useful for REDDnet because its a point-to-point
      • would like to deploy a REDDnet based SE, but right now they are deploying a dcache based SE (physics cluster)
      • have a campus cluster as well, freeing up some space there, they will be a part of UT network.
      • Micah has funding for standard REDDnet depots.
      • same amount at NCState
    • CMS and REDDnet (Dan, Chris)
      • Next week at CERN, Dan will work with Lassi Turi on fixing the CMSSW interface that has been broken in the most recent release of CMSSW.
      • hope very soon to get started with an initial test group of three CMS users to try out using REDDnet as a SE for their work.
    • Status of FACIT-Globetrotter work (Santi, Chris)
      • hidden file was cause of compile problem UCSB was having (we believe)
      • corrupted argument problem in Javaws can be fixed and Santi will do that
      • Chris will repackage all of this and make sure it will work when UCSB goes to install it.
    • Status of depots (Bobby)
      • Fixing the bad SDSC depot
      • Any fall-out from the depot upgrade? (and simultaneous l-server upgrade)?
  • Brief Status reports
    • Status of TVNA work
    • VM Depot Status (Bobby)
      • Are we still on target for Monday?
    • Status of work at SFASU (Diane)
    • Status of ORNL depots (Bobby, Jim)
      • did Lun for Jim get created?
    • PerfSONAR integration status (Bobby, Martin)
    • UTK tests
    • Terscale Supernova Project (Terry)
    • Status of CERN depots
      • nothing to say here, Dan and Paul will know more when they get there next week.