TSSP Procedures
Jump to navigation
Jump to search
This section contains recommendations pertaining to the Issues section of the TSSP Framework article.
Fault Tolerance
| Step | Occurrence | Failure Type | Procedure |
|---|---|---|---|
| obtain metadata | 5 | - | - |
| fill channel | 3 | - | - |
| obtain depot set | 2 | - | - |
| determine next depot | 2 | - | - |
| reserve channel | 2 | - | - |
| publish/record metadata | 2 |
|
- |
| order depot set | 1 | - | - |
| expire channel | 1 | - | - |
| consume content | 1 | - | - |
| channel duration | 1 | - | - |
| channel capacity | 1 | - | - |