August 8, 2008: Difference between revisions

From ReddNet
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
* Meeting ID is 7333
* Meeting ID is 7333


==Attending (???) ==
==Attending ==
* Alan, Bobby, Matt and Santi (Vanderbilt ACCRE)
* Alan, Bobby, Dan, Matt and Santi (Vanderbilt ACCRE)
* Diana (SFASU)
* Diana (SFASU)
* Micah, Terry and Chris (UTK)
* Chris, Harrold, Micah and Terry (UTK)
* Hunter (Nevoa)
* Hunter (Nevoa)
* Jim and John (ORNL)
* Jim and John (ORNL)
* Dan, Julie and Paul (Vanderbilt Physics)
* Julie and Paul (Vanderbilt Physics)


==Agenda ==
==Agenda ==
Line 18: Line 18:
* Quick Status reports
* Quick Status reports
** Status of FACIT-Globetrotter work (Santi, Chris)
** Status of FACIT-Globetrotter work (Santi, Chris)
*** Any more interaction with Justing at UCSB?  Any news?
*** Any more interaction with Justin at UCSB?  Any news?
*** Santi will try to contact them to get a status report
** Status of TVNA work
** Status of TVNA work
*** Any progress on getting transfers to LoC?
*** Any progress on getting transfers to LoC?
** VM Depot Status  
*** Matt will try to Thomas and get a status update today
** Status of work at SFASU (PR, Diane)
** New L-Store client (Santi)
*** extra retries to reduce problems when a depot is acting up
*** want to restart the meta data server on vumeta1
*** new rename feature
** VM Depot Status (Bobby, Paul)
** Status of work at SFASU (Diane)
** Status of CERN depots
** Status of CERN depots
*** depots have arrived at CERN
*** depots have arrived at CERN
*** installation plans
*** installation plans
** Status of ORNL depots (Bobby, Jim)
** Status of ORNL depots (Bobby, Jim)
*** Jim checking both implementations of LoCI and L-Store up and running
*** getting a more in depth understanding so can write up necessary security documentation
*** Bobby will create a lun for Jim's depot at home so he can write to it.
** PerfSONAR integration status (Bobby, Martin)
** PerfSONAR integration status (Bobby, Martin)
*** working meeting at I2 offices in DC at end of August
*** working meeting at I2 offices in DC at end of August (25 & 26)
*** meet with Jason and Martin
*** they will work with us to make sure we have a display at SC08
*** middle of October I2 meeting in New Orleans... possibly do something there?
** UTK tests
** UTK tests
*** uploaded 1 Gig on REDDnet, had LODN replicate it to 7 TB.
*** about 20% complete on a download of all this data.
*** getting about 30 Mbs, but this may be limited by UTK network?  (Building only has 100 Mbs connection)
*** verifying files and so far all of them are OK.
** Terscale Supernova Project (Terry)
*** Blondin is about to ramp up his efforts, plan to use  REDDnet to distribute some new data that has just been generated to his colleagues
** doxygen documentation (Julie)
** doxygen documentation (Julie)
*** see links at [[http://www.reddnet.org/mwiki/index.php/Documentation http://www.reddnet.org/mwiki/index.php/Documentation]]
*** see links at [[http://www.reddnet.org/mwiki/index.php/Documentation http://www.reddnet.org/mwiki/index.php/Documentation]]
Line 37: Line 55:


* Protocol clarification/cleanup
* Protocol clarification/cleanup
** Alan will start a wiki page listing proposed cleanups, extenstions, backwards incompatible changes, etc.
** move towards a new release of the protocol

Latest revision as of 14:11, 14 August 2008

REDDnet Collaboration Meeting

Coordinates

  • August 8, 2008 -- 11:00ET/10:00CT/8:00PT
  • Call 510-665-5437
  • Meeting ID is 7333

Attending

  • Alan, Bobby, Dan, Matt and Santi (Vanderbilt ACCRE)
  • Diana (SFASU)
  • Chris, Harrold, Micah and Terry (UTK)
  • Hunter (Nevoa)
  • Jim and John (ORNL)
  • Julie and Paul (Vanderbilt Physics)

Agenda

  • Quick Status reports
    • Status of FACIT-Globetrotter work (Santi, Chris)
      • Any more interaction with Justin at UCSB? Any news?
      • Santi will try to contact them to get a status report
    • Status of TVNA work
      • Any progress on getting transfers to LoC?
      • Matt will try to Thomas and get a status update today
    • New L-Store client (Santi)
      • extra retries to reduce problems when a depot is acting up
      • want to restart the meta data server on vumeta1
      • new rename feature
    • VM Depot Status (Bobby, Paul)
    • Status of work at SFASU (Diane)
    • Status of CERN depots
      • depots have arrived at CERN
      • installation plans
    • Status of ORNL depots (Bobby, Jim)
      • Jim checking both implementations of LoCI and L-Store up and running
      • getting a more in depth understanding so can write up necessary security documentation
      • Bobby will create a lun for Jim's depot at home so he can write to it.
    • PerfSONAR integration status (Bobby, Martin)
      • working meeting at I2 offices in DC at end of August (25 & 26)
      • meet with Jason and Martin
      • they will work with us to make sure we have a display at SC08
      • middle of October I2 meeting in New Orleans... possibly do something there?
    • UTK tests
      • uploaded 1 Gig on REDDnet, had LODN replicate it to 7 TB.
      • about 20% complete on a download of all this data.
      • getting about 30 Mbs, but this may be limited by UTK network? (Building only has 100 Mbs connection)
      • verifying files and so far all of them are OK.
    • Terscale Supernova Project (Terry)
      • Blondin is about to ramp up his efforts, plan to use REDDnet to distribute some new data that has just been generated to his colleagues
    • doxygen documentation (Julie)
  • Protocol clarification/cleanup
    • Alan will start a wiki page listing proposed cleanups, extenstions, backwards incompatible changes, etc.
    • move towards a new release of the protocol