June 9-10, 2009; TG Tutorial Planning Meeting (VU): Difference between revisions

From ReddNet
Jump to navigation Jump to search
(New page: == Slides still needed == * Security scheme -- ** Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads ** Future == Items needed on-site/available == * Version ...)
 
No edit summary
Line 1: Line 1:
== Slides still needed ==
== Slides still needed ==
* Security scheme --  
# Security scheme --  
** Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads
## Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads
** Future
## Future
== Items needed on-site/available ==
== Items needed on-site/available ==
* Version of LoDN Download client that can use LoRS if installed
# Version of LoDN Download client that can use LoRS if installed
* Hand outs for participants
# Hand outs for participants
** Slides (2 per page, front and back)
## Slides (2 per page, front and back)
** Instruction sheets for steps in the Hands on phase
## Instruction sheets for steps in the Hands on phase
== Documents ==
== Documents ==
* Current schedule for tutorial
# Current schedule for tutorial
* Current version of the slides
# Current version of the slides

Revision as of 09:42, 12 June 2009

Slides still needed

  1. Security scheme --
    1. Current: Proxy allocations via LoDN/GridFTP produce audit trail of data uploads
    2. Future

Items needed on-site/available

  1. Version of LoDN Download client that can use LoRS if installed
  2. Hand outs for participants
    1. Slides (2 per page, front and back)
    2. Instruction sheets for steps in the Hands on phase

Documents

  1. Current schedule for tutorial
  2. Current version of the slides