Aug 02, 2007
Coordinates
- Time: 10:00EST/9:00CST/7:00PST
- Conference #:510-665-5437 Meeting ID:7333
Attending
- Alan Tackett, Larry Dawson, Santi de Ledesma, Bobby Brown (Vanderbilt ACCRE, in Nashville)
- Dan Engh, Paul Sheldon (Vanderbilt Physics)
- Micah Beck, Terry Moore (UT)
- P.R. Blackwell, Diana Gunter (SFAU)
- ??? (Nevoa, via Skype from Brazil)
Agenda for today's call
Bobby Brown: status of deployment work
- rough plan for the future. Discussion of where to site new depots.
Alan/Larry/Hunter: status of L-Store work at ACCRE/Nevoa
- LoRS/L-Store view
- Nevoa integration
- packaging for install
- testing status
Micah: LoDN Status
Paul: annual report outline and work assignments
Dan: status of CMS work, discussion of possible RHIC task
PR: status/plans
Upcoming Events
- Library of Congress meeting, Sept. 17
- Meeting in San Diego, Oct. 8th.
- Supercomputing 07
All other business
Notes from the call
- Bobby Brown: status of deployment work, rough plan for the future. Discussion of where to site new depots.
- Vandy internal deployment is almost done. 10 test depots, 4 test meta-data servers, 10 depots at ACCRE, 2 meta-data servers
- REDDnet domain with monitoring software has been established; management node.
Nagio page
2 depots are being sent to PR; that would be 6TB; if we need more we can add to that.
In working with the Library of Congress, ACCRE has discovered a bug and he doesn’t know where it sits. Some allocations on resource 0 are disappearing. The standard way IBP has been used is to configure separate disks as separate depots, rather than as one depot with 4 resources. Under the latter configuration, it’s breaking, losing slices. It seems to be some kind of confluence of factors, which may include.
Various possible sources of the problem were discussed.
It’s not reproducible yet.
Working with VTNA
External sites where we’re going to install sights 1) UM 6TB 2. Cal Tech 6TB 3. Florida 6TB
Tyan motherboard and chasis. Nothing. Using 3TB per U 4 750GB drives 3 or 4 at UMich $2045 per TB, $700 per TB 3TB per depot
SDSC – Terry and Micah will grease the wheels here. ORNL is another option.
(2) Alan/Larry/Hunter: status of L-Store work at ACCRE/Nevoa
a) LoRS/L-Store view
Santi got a new version of Nevoa explorer; Storecore is working and fully integrated with L-Store; Storecore is providing the depot list,
L-Store is scheduled to do a release; There are issues with the GUI that Santi is working with. Discussed L-Store with Brian Burke and he has even/odd code working Aislan: We tested the L-Store client with N-explorer and store core at there site. They discovered some problems and fixed them.
They have a java installer for Nevoa explorer. They plan to make and installer for L-Store.
L-Store will be release .8. There’s no fault tolerance on the Metadata and the security features haven’t been activated. The security feature doesn’t scale at this point and there’s no user interface for it.
What’s the status on LoRS view? The plan is to assign a student intern to it.
b) Nevoa integration c) packaging for install d) testing status
They’re doing nightly builds
Micah talked about his recent missive on DCMA and content control on the depots.